Overflow relief gully installation requirements
Careful consideration is needed at the commencement of the job to establish expectations about:
- finished floor and external ground levels, and
- the appropriate placement of the overflow relief gully
to enable compliance with the finished height requirements.
The ORG instillation requirements are the minimum requirements that need to be complied with.
Diagram of finished height requirements for overflow relief gully (ORG)(PDF, 229KB)